Projects & Gallery

HDD and trenchless utility work delivered on time and on budget.

Vermeer horizontal directional drill staged at a wooded utility job site

Louisiana corridor

HDD Field Operations

Scope: Vermeer directional drill mobilized for trenchless utility installation along a wooded ROW.

Challenge: Tight roadside workspace — traffic control and bore staging completed with zero lane closures.

Utility truck towing orange conduit spool along a tree-lined road with safety cones

Rural highway corridor

Roadside Conduit Installation

Scope: Orange HDPE conduit spool deployment with traffic control for fiber and telecom undergrounding.

Challenge: Active two-lane road — cone pattern and crew coordination kept traffic moving safely.

HDPE pipe pullback into a trench at a commercial construction site

Commercial development

Commercial Site Pullback

Scope: Large-diameter HDPE pullback into prepared trench at an active building site.

Challenge: Coordinated pipe payout and trench alignment with ongoing construction activity on site.

Utility worker in a bucket truck performing overhead line work

Distribution corridor

Overhead Utility Coordination

Scope: Aerial utility work coordinated alongside underground scope to clear conflicts before bore initiation.

Challenge: Congested pole line — sequencing aerial and subsurface work without service interruption.

Large conduit coil on a dispenser trailer at a commercial building site

Commercial facility

Building Conduit Placement

Scope: Conduit coil payout and placement for utility service entry at a metal building site.

Challenge: Limited laydown area — staged pipe and excavation to protect finished building elevations.

Vermeer drill rig staged on a roadside work zone with traffic cones

Louisiana roadway

Roadside HDD Mobilization

Scope: Vermeer drill rig positioned with traffic control for a utility crossing beneath a paved corridor.

Challenge: Narrow shoulder — equipment set on grade with full cone protection and spotter coverage.

Chevrolet 3500 HD truck towing a large spool of orange conduit

Regional project site

Conduit Material Staging

Scope: 3500-series utility truck and trailer staging orange conduit for an upcoming bore and pullback.

Challenge: Secure load planning and site access for heavy material delivery ahead of night-work window.

Fresh concrete pad curing at a commercial shopping center job site

Bossier Parish, LA

Commercial Site Restoration

Scope: Concrete pad and surface restoration following underground utility installation at a retail center.

Challenge: Finished surface protection — wet concrete curing with barricades until full strength achieved.

Flatbed truck towing a trailer loaded with multiple conduit spools

Louisiana

Multi-Duct Material Staging

Scope: Gooseneck trailer delivery of multiple duct spools for a bundled conduit HDD installation.

Challenge: Mixed spool sizes — load securement and inventory staging for sequential pullback operations.

Vermeer directional drill secured on a flatbed transport trailer

Louisiana & regional

Equipment Mobilization

Scope: Vermeer HDD rig transport on flatbed trailer for rapid mobilization to active bore sites.

Challenge: Oversize load securement and permitting for interstate and rural route delivery.

Ready to move your project underground?

Get a feasibility review and quote from our HDD specialists.